Green Thumb Industries. Warwick, NY
41°16’28.00” N 74°18’49.07” W
Scope
- Site development for a $60 Million 200,000-square-foot National Cannabis Consumer packaging company.
- Cut/Push to Fill 150,000 cubic yard of native earth.
- Install internally sloped Fertigation disposal system for a 200,000 SF facility.
- Construction of over 18,000 face feet of Stone Strong SRW retaining wall system.
- A cooperative value engineering effort which provided a significant schedule and monetary savings.
Lego Land New York. Goshen, NY
41°22’40.48” N 74°18’50.22” W
Scope
- Finish hardscape installation including traditional and custom decorative finishes.
- Installation of Micro-drainage throughout all front of house pedestrian travel ways.
- Site wide curb installation & asphalt paving.
Marlboro Middle School. Marboro NY
41°36’30.48” N 73°58’30.48” W
Scope
- Capital Project for Site & Infrastructure Improvements. Relocation of site utilities, Installation of a T-Wall earth retaining system to support an addition to the existing structure.
- Asphalt paving, Concrete Curb & Flat Work.
Truman Moon, William Carter, & Presidential Park Elementary Schools, Monhagen Middle School. Middletown, NY
41°26’10.41” N 74°25’28.25” W
41°26’41.71” N 74°23’29.27” W
41°27’30.11” N 74°25’20.04” W
41°27’04.13” N 74°2654.66’” W
Scope
- Site & Safety improvements. Modifying the school’s site to better comply with contemporary SED Requirements.
- Installation of two playgrounds with acrylic & synthetic carpet surfacing totaling over 53,000 SF.
- Installation of a 58,000 sf acrylic Athletic Multi-Sport court surface.