skip to Main Content

New York State Thruway Authority Culvert relining from Exit 16 to Exit 21

Scope

  • Clean, camera, and reline culvert crossings under Interstate 87.
  • Reconstruct drainage structures.

Precast Bridge Deck Replacement. NYS Route 302 over Pakanasink Creek. Pine Bush, NY

41°35’36.12” N 74°18’36.84” W

Scope

  • Saw-cut roadway bridge deck and prepare for removal.
  • Lift, load, and dispose of deteriorated bridge deck units.
  • Install pre-cast bridge deck panels and install closure pours.
  • All work completed over a twenty-four-hour-per-day, seven-days-per-week effort.

Woodbury Commons. SMU faced pile and lag wall construction. Monroe, NY

41°19’00.46 N 74°07’33.86”

Scope

  • Construct custom-engineered eighteen-foot tall pile and lag wall eight feet offset from NYS Thruway ramp.
  • Construct SMU face wall attached to pile and lag wall to allow for Woodbury Commons ring road construction.

NYSDOT Route 208 Bridge construction over Heritage Trail. Monroe, NY

41°20’06.24” N 74°11’27.62” W

Scope

  • Demolish existing steel superstructure bridge
  • Install new precast bridge and tunnel structure over Heritage Trail.
  • Install required earthen fill and reconstruct Rt. 208 above.