New York State Thruway Authority

Culvert relining from Exit 16 to Exit 21

Scope

  • Clean, camera, and reline culvert crossings under Interstate 87.
  • Reconstruct drainage structures.

NYS Route 302 over Pakanasink Creek

Precast bridge deck replacement

Scope

  • Saw-cut roadway bridge deck and prepare for removal.
  • Lift, load, and dispose of deteriorated bridge deck units.
  • Install pre-cast bridge deck panels and install closure pours.
  • All work completed over a twenty-four-hour-per-day, seven-days-per-week effort.

Woodbury Commons

SMU faced pile and lag wall construction,

Scope

  • Construct custom engineered eighteen foot tall pile and lag wall eight feet offset from NYS Thruway ramp.
  • Construct SMU face wall attached to pile and lag wall to allow for Woodbury Commons ring road construction.

N.Y.S.D.O.T Route 208

Bridge Construction over Heritage Trail

Scope

  • Demolish existing steel superstructure bridge
  • Install new precast bridge and tunnel structure over Heritage Trail.
  • Install required earthen fill and reconstruct Rt. 208 above.